SPT contract from Glasgow to refurbish four subway stations. The first part included the Kelvinbridge and Shields Road stations.
KELVINBRIDGE
Proposal included new interior design (new layout, finishes), a new solution for roofing over the central area (the aim was to get more natural light into the interior) and especially the proposal for a new exterior escalator (verifying various options from reusing already existing structures, to complete removing contemporary escalator and its full replaced with a new structure.
SHIELDS ROAD
The proposal included the interior (new layout, finishes), and the possibility of repairing roofing of the central space because the existing roof was in poor condition.